User Tools

Site Tools


work_breakdown_schedule

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
work_breakdown_schedule [2017/08/16 13:22] – created leogeorgescuwork_breakdown_schedule [2017/08/16 13:26] (current) leogeorgescu
Line 1: Line 1:
-Schedule\\+<fs x-large>Schedule</fs>\\
 \\ \\
 Week of 8/14/2017\\ Week of 8/14/2017\\
-    -+    -Find the servo boards. Currently Arduino with Maestro Motor Controller from Pololu 
 +    -Purchase from the required equipment 
 +    -Figure out how to attach 
 +    -Attach boards to the PTV 
 + 
 +Week of 8/21/2017\\ 
 +  - Final adjustments (wiring, add-ons) 
 +  - Program to connect to the RC board 
 +  - The goal is to finish the project and tutorial my 8/27/2016 
work_breakdown_schedule.1502914976.txt.gz · Last modified: by leogeorgescu