User Tools

Site Tools


tesla_journal2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
tesla_journal2 [2019/08/12 09:24] – [Project Status] yuhanghetesla_journal2 [2019/08/12 09:36] (current) – [What I Learned about Myself] yuhanghe
Line 18: Line 18:
 ==== What I Learned about Myself ==== ==== What I Learned about Myself ====
  
 +In all honesty, I have never thought about working with the construction process before. From my minimal experience with construction process, I always had the impression that the technology they employed are archaic. That is the reality of much of the construction process currently. However, it not occur to me that the reason why construction is so out-dated is because of the difficulty of employing robotic and automation during construction due to the chaotic and unstructured nature of construction site. However, with the advance of various sensors and robotics, I believe that there is potential to successfully deploy robots in the work site.
 ==== Project Status ==== ==== Project Status ====
  
Line 25: Line 25:
 ==== Project Agenda ==== ==== Project Agenda ====
  
-current and immediate future agenda is to study Boston Dynamic'API for Spot Mini in preparation for the training in BostonFortunatelyBosdyn left detailed comments in their APIs and have no trouble navigating them+Next week, will travel to Boston Dynamic'headquarter to directly learn how to control Spot from BD's engineersHopefullywe well receive answers to all the questions about Spot from their engineering teams. am looking forward to the opportunity of touring BD's research lab and learn more about what Spot's capability. Fingers crossed that the Spot is as amazing as BD claimed to be.
tesla_journal2.1565627071.txt.gz · Last modified: by yuhanghe